Currency KZT
Reconstruction of airfield coverings of the domestic airports. order in Almalybak
Order Reconstruction of airfield coverings of the domestic airports.
Reconstruction of airfield coverings of the domestic airports.
rekonstrukciya-aerodromnyh-pokrytij-otechestvennyh
rekonstrukciya_aerodromnyh_pokrytij_otechestvennyh

Reconstruction of airfield coverings of the domestic airports.

Reconfirm the price with seller
Seller
Kazakhstan, Almalybak
(View map)
Description

RGP KAZAER0PR0EKT at Committee of civil aviation of the Republic of Kazakhstan gave appreciation to work of the Real Way company on construction, repair and reconstruction of airfield coverings of the domestic airports.

Construction of IVPP-2 the airport of Almaty, examination on professionalism unique building on creation of the second take-off landing strip together with the Italian firm GODEST became 1993-1995-.

1995 - the airport, Almaty. Repair of a concrete covering of a runway without the termination of operation of the runway was executed. On the area more than 2000 sq.m old reinforced concrete plates were dismantled and replaced with the new reinforced concrete plates made in shops of the Company.

1996-1997 - works on repair of an asphalt concrete covering of the platform and places of parking of airfield of the airport of Almaty.

1998 - aeroportg. Almaty. Works on capital repairs of the first runway were performed. For the first time in Kazakhstan large-scale capital repairs by the operating runway were carried out without the termination of its operation. 250 thousand tons of asphalt concrete were laid, 11 km of seams in the armobetena and asphalt concrete are cut. The asphalt concrete covering of a runway of the Almaty airport keeps integrity within 10 years of intensive operation in the conditions of sharp and continental climate and the raised press loadings that confirms high quality of a roadwork.

____________________________________________________________________________________

1999 - the airport Astana. Still perfect flatness and integrity of an asphalt concrete covering of the highway to the airport of Astana which has the covering conforming to the international standards is pleasing to the eye.

1999-2003 - the airport of Atyrau. The company performed works on capital repairs of an access road and platforms of the airport.

2002 - the airport Manas Bishkek. At the capital airport of the Republic Kyrgyzstan difficult works on cutting of seams for the device signalnsy systems were performed.

2003 - the airport Uralsk. The most difficult work on capital repairs of concrete coverings of a runway is performed. It was repaired the 4000th running meter of old compensation and deformation seams, 753 running meters of compensation seams are cut, 11750 running meters of jointing and repair of old cracks are executed. Capital repairs of an asphalt concrete covering of an access road to the airport 4,5 km long were executed in a short time.

2009. International airport Akzhol of Uralsk. Performance of the first stage on maintenance without violation of concrete coverings runway strips, and also without the termination of operation and change of the schedule of flights, within one month was is executed 7200 running meters of jointing and repair of the existing cracks, specialized materials repaired more than 300 square meters concrete the covered IVPP.

Contact the seller